Digital Factory Console
Sensors → Edge → SCADA · MES · MOM · SAP → Databricks · Foundry · Ontology → Twin · ML · BI
Day 1 · 08:00:00 Log 0● all nominal

China line · lot L-1045 · 2,400 pin headers

Same defect. Watch where the lot goes.

— Minutes to contain the void
— Minutes plate press P2 is down
— Of this lot that left the plant
L-1045

01

Mold

Housing, 12 s

02

Plate

Press P2

03

Assemble

Crimp

04

Inspect

Camera

Lot L-1045 is about to enter mold.

Why agents

A traditional line moves the lot. An agent moves the decision, and only when the plant can carry it out.

Today

The press current is already in the historian. The camera raises six alarms. The operator clears them, because the lot is late, and L-1045 leaves the line.

Containment starts after the shipment. Four hours to name the lot. Press P2 is down 38 minutes. $432 of this lot is already gone.

Agents

The same drift reaches a repair check: an anode basket, and a plater on this shift. Stock is 0, so no work order opens. The press keeps running.

The same six alarms become one incident: plating void, pin 3, Inspect. The hold waits for a second person. The lot stays. Four minutes to contain. $0 of this lot ships.

The apps on this lot

Computer vision, predictive maintenance, inventory, planning, and OEE each report one fact. The agent is the role that uses those facts on L-1045, in one decision.

  1. Computer vision Real-time inspection

    The camera sees a plating void on pin 3. The agent turns six alarms into one incident at Inspect.

  2. Predictive maintenance Press P2 current

    The drift is the cause. The agent asks for a repair only when a plater is on this shift.

  3. Inventory Anode basket

    Stock is 0. The agent leaves the work order closed, and the press keeps running.

  4. Planning The lot is late

    The schedule wants L-1045 out the door. The agent holds it at Inspect, so the defect is settled first.

  5. OEE Press stays up

    The void is contained in 4 minutes. Press P2 downtime stays at 0, because the repair cannot be done.

  6. Closed-loop quality A person still signs

    The agent drafts the hold. A second person approves it. Release uses the same two-person rule.